Detail W-240, 3/4" TO 2" REDUCED PRESSURE BACKFLOW ASSEMBLY (MULTI-FAMILY/COMMERCIAL) – Cape Coral, FL

FillingPDF is not affiliated with, endorsed by, or connected to the City of Cape Coral Building Division. Get the official form from the City of Cape Coral Building Division website.

Detail W-240, 3/4" TO 2" REDUCED PRESSURE BACKFLOW ASSEMBLY (MULTI-FAMILY/COMMERCIAL) – Cape Coral, FL

Detail W-240 is the City of Cape Coral's 3/4" to 2" Reduced Pressure Backflow Assembly (Multi-Family/Commercial) document. This page lets you fill out the PDF online and download or print it, with revision dates and agency contacts.
1 page
Page 1 of 1
Click an element to change it — or pick a tool to add one

Detail W-240 is the City of Cape Coral document titled 3/4" TO 2" REDUCED PRESSURE BACKFLOW ASSEMBLY (MULTI-FAMILY/COMMERCIAL), published on the City's website under Development Services, Land Development Division. It is meant for multi-family and commercial work that involves a reduced pressure backflow assembly in the size range printed in its title. For questions about a Cape Coral permit, the Land Development Division page lists guidelines and forms and gives a phone number and email address. On this page you can fill out the form online on FillingPDF and download or print the completed PDF; the original document stays at the City's website.

Last updated

What is W-240?

Detail W-240, 3/4" TO 2" REDUCED PRESSURE BACKFLOW ASSEMBLY (MULTI-FAMILY/COMMERCIAL), is a numbered City of Cape Coral document for a reduced pressure backflow assembly in the size range and use category printed in its title.

The page carries a small identification block with a detail name, the detail number W-240, a revision date of 07-14-2022 and an adoption date of 08-17-2022. The title limits it to multi-family and commercial use, so it is a different document from any detail written for another size range or another type of property.

The City of Cape Coral posts the PDF on its website in the Development Services, Land Development Division document folders. The Division's page on other development permits says that each permit has a guideline that identifies the submittal requirements and pertinent information, together with the relevant forms.

W-240 does not print an application, a fee, a deadline or a submittal address. It is a reference document identified by its number and revision dates, and it is not by itself a permit.

Who needs to file W-240?

The title places Detail W-240 with multi-family and commercial projects that involve a reduced pressure backflow assembly of 3/4" to 2". Property owners, contractors, designers and installers working on that kind of assembly are the audience the document names through its title.

  • The document does not say who must use it, who must sign it or who is exempt.
  • Whether it applies to a particular project is a question for the City. The Land Development Division page directs questions to (239) 573-3167 or [email protected].
  • Projects outside the multi-family/commercial category or outside the size range in the title should check which detail the City points to for that case, because W-240 names its own scope.

The Division's page also says that the guideline for each permit it processes lists the submittal requirements, so a permit applicant should confirm there whether this detail is part of the package.

How to fill out W-240

  1. Open the document

    Open the PDF for Detail W-240 and confirm the title reads 3/4" TO 2" REDUCED PRESSURE BACKFLOW ASSEMBLY (MULTI-FAMILY/COMMERCIAL).

  2. Confirm the detail number

    Check that the detail number in the identification block is W-240 and that the detail name matches the assembly in your project.

  3. Check revision and adoption dates

    Note the revision date 07-14-2022 and the adoption date 08-17-2022 printed on the page, so you know which revision you are working from.

  4. Match scope to your project

    Confirm that your project is multi-family or commercial and that the assembly falls in the size range in the title.

  5. Complete any entries the PDF offers

    Fill in only the entries this PDF presents; the page prints no other line or part numbers to follow. Ask the Land Development Division at (239) 573-3167 if you are unsure what to enter.

  6. Review and download the PDF

    Check your entries, then download or print the completed PDF from FillingPDF. Confirm with the Land Development Division how it is to be included in your permit package.

How to submit W-240

Detail W-240 prints no filing channel, address or portal of its own, so there is no submission route to copy from the document. The City's pages give these ways to get direction:

Before you send anything, check the guideline for your permit to see whether W-240 belongs in the package and how that package is delivered. The City's pages do not state a fee for this document. FillingPDF lets you fill out and download the PDF; submission follows the City's channels described above.

Common mistakes to avoid

  • Using Detail W-240 for a project outside the multi-family/commercial category printed in its title.
  • Using it for an assembly outside the size range in its title, 3/4" to 2".
  • Assuming W-240 lists the permit submittal requirements; the Land Development Division says each permit's guideline identifies them.
  • Relying on a saved copy without checking the revision date (07-14-2022) and adoption date (08-17-2022) against the City's current PDF.
  • Looking for a mailing address or deadline on W-240; none is printed, so confirm them with the Land Development Division.

Frequently asked questions

What is Detail W-240 in Cape Coral?

Detail W-240 is a City of Cape Coral document titled 3/4" TO 2" REDUCED PRESSURE BACKFLOW ASSEMBLY (MULTI-FAMILY/COMMERCIAL). It is published on the City's website in the Development Services, Land Development Division folders and carries a revision date of 07-14-2022.

Is W-240 a Cape Coral permit application?

No application is printed on it. W-240 shows a detail name, the number W-240 and revision dates. The Land Development Division says each permit has a guideline identifying its submittal requirements and forms, so check that guideline for your permit.

What revision of W-240 is this?

The page prints a revision date of 07-14-2022 and an adoption date of 08-17-2022. Compare those dates with the City's current PDF before relying on a saved copy.

Who do I contact about W-240 or a Cape Coral building permit?

Contact the Land Development Division at (239) 573-3167 or [email protected]. Its page says it assists with the other permit types it processes and with their guidelines and forms.

Does W-240 apply to single-family homes?

The title limits it to multi-family and commercial use for a 3/4" to 2" assembly, and the document does not say it covers anything else. Ask the Land Development Division which detail applies to a different type of property.

Can I fill out W-240 online?

You can fill out the PDF online on FillingPDF and download or print it. FillingPDF is an independent service and does not submit anything to the City; you deliver the document through the City's channels.

Is there a fee or deadline for W-240?

W-240 prints neither a fee nor a deadline. Ask the Land Development Division about any fee or timing that applies to your permit, and check the permit guideline for its submittal requirements.

Ready to fill out W-240?

Fill out W-240 now