The Affidavit in Lieu of the Construction Parking Management Plan (CPMP) is a City of Miami Beach Building Division form used in place of a full Construction Parking Management Plan for three kinds of permit applications. It is a construction-permit document, not a permit to park a vehicle, so it sits apart from a typical miami beach parking permit search. Property owners, general contractors and subcontractors use it for a change of contractor, an exact mechanical equipment change-out or a subcontractor permit. On FillingPDF you can fill out the form online and download or print the completed PDF; the City publishes the original on miamibeachfl.gov.
Last updated
What is Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL?
The Affidavit in Lieu of the Construction Parking Management Plan (CPMP) is a sworn, notarized statement issued by the City of Miami Beach Building Division that certain permit applicants sign instead of preparing a new Construction Parking Management Plan.
The form lists the three permit applications it can be used for, each with a condition:
- Change of Contractor: if the new contractor uses the same approved CPMP as the previous contractor.
- New Permit for Mechanical Equipment Replacement: if the permit is for an exact change-out.
- New Permit for Subcontractor: if the Master Permit already has an approved CPMP.
By signing, the signer certifies two things. First, that they have reviewed and agree to abide by the parking arrangements in the CPMP number written on the form; this item is marked N/A for a mechanical exact change-out permit. Second, that they have read and understood the requirements and penalties for a CPMP violation under Miami Beach City Code, Division 3, Construction Parking and Traffic Management Plan, Sections 106-96 to 106-106 (Ord. No. 2015-3922).
Each signer's statement is sworn before a Florida notary public, so the form includes a notary block for each signature. The affidavit is a different document from the Construction Parking Management Plan (CPMP Form), which the Building Division lists separately on its forms page.
Who needs to file Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL?
The form is signed by the people tied to the permit being requested. It has signature blocks for the property owner, the general contractor and the subcontractor, and the subcontractor block is marked as not applicable for a change of contractor or a mechanical exact change-out.
You can use it only in the three situations the form lists:
- You are taking over a project as the new contractor and will use the same approved CPMP as the previous contractor (Change of Contractor).
- You are applying for a new permit that is an exact change-out of mechanical equipment.
- You are a subcontractor applying for a sub permit under a Master Permit that already has an approved CPMP.
The form says to check one section only. If your permit does not fit one of these conditions, for example if the Master Permit has no approved CPMP, the affidavit is not the right document, and the Construction Parking Management Plan (CPMP Form) listed on the Building Division's forms page applies instead. Each signer must appear before a notary, because every signature block carries a notary jurat. The form does not describe signing through a representative.
When to file Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL
Complete the affidavit when you apply for one of the permits it covers: a change of contractor on an existing CPMP, a new permit for an exact mechanical equipment change-out, or a new subcontractor permit under a Master Permit that already has an approved CPMP. The form prints no separate due date, so it goes in with that permit application. Have the existing permit number and CPMP number ready before you start, and arrange the notary for every signer, since each signature is sworn. For any timing rule on the underlying permit, check with the City of Miami Beach Building Division.
How to fill out Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL
Choose one application type
Check only one: Change of Contractor, Mechanical Equipment Replacement (exact changeout) or Subcontractor. Make sure your situation meets the condition listed for that type.
Enter permit and property details
For Change of Contractor, enter the Permit #, the CPMP # and the Property Address.
Complete the mechanical replacement section
If you checked Mechanical Equipment Replacement (exact changeout), enter the Permit # of the exact change-out permit.
Complete the subcontractor section
If you checked Subcontractor, enter the Master Permit #, its approved CPMP # and your Sub Permit #.
Review the two certifications
Certification 1 refers to the CPMP number whose parking arrangements you agree to follow; write N/A for a mechanical exact change-out permit. Certification 2 confirms you read the CPMP violation requirements and penalties in Miami Beach City Code Sections 106-96 to 106-106.
Fill in each signer's block
For the property owner, general contractor and, where it applies, the subcontractor, enter the address or company name and the printed name. The subcontractor block is marked not applicable for a change of contractor or a mechanical exact change-out.
Sign before a notary
Each signer signs and appears before a Florida notary public, who completes the jurat: whether the signer is personally known or produced identification and its type, the date, the notary signature and the notary name.
Review and download the completed PDF
Check the permit and CPMP numbers and that only one section is checked. Download or print the completed PDF from FillingPDF, then collect the notary's signature and submit it as described under How to submit.
How to submit Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL
The form prints no address, portal or appointment rule of its own. It is used for the permit applications it lists, so it goes in through the City of Miami Beach Building Division with that permit application.
- Permit application: include the signed and notarized affidavit with your Change of Contractor, Mechanical Equipment Replacement or Subcontractor permit application.
- Building Division forms page: the form is listed, with the other building forms, at https://www.miamibeachfl.gov/city-hall/building/forms. The same Building menu has pages on how to apply and on online permitting.
- Notary: every signer's block must be completed before a Florida notary public before you submit.
For channels, hours or fees tied to your permit, ask the Building Division. FillingPDF lets you fill out and download the PDF; submission follows the channels above.
Common mistakes to avoid
- Checking more than one section; the form says to complete the applicable section and check one only.
- Using the affidavit when the Master Permit has no approved CPMP, or when the new contractor will not use the same approved CPMP as the previous one.
- Writing a CPMP number in certification 1 for a mechanical exact change-out, which the form marks N/A.
- Mixing up the Master Permit # and the Sub Permit # in the Subcontractor section.
- Leaving the notary block incomplete: identification type, date, notary signature or notary name.
- Signing without appearing before the notary, when the form says the statement is sworn to and subscribed before the notary.
- Filling in the subcontractor block on a change of contractor or mechanical exact change-out, where the form marks it not applicable.
- Omitting the Property Address or the Permit # at the top of the Change of Contractor section.
Frequently asked questions
What is the Affidavit in Lieu of the CPMP?
It is a City of Miami Beach Building Division form that certain permit applicants sign and have notarized instead of submitting a new Construction Parking Management Plan. It covers a change of contractor, an exact mechanical equipment change-out and a subcontractor permit, each under a stated condition.
Is this a Miami Beach parking permit?
No. It is a construction-permit affidavit about the parking arrangements of a Construction Parking Management Plan (CPMP), not a permit to park a vehicle. It is used with a Change of Contractor, Mechanical Equipment Replacement or Subcontractor permit application.
When can I use the affidavit instead of a full CPMP?
Only in three cases: a change of contractor using the same approved CPMP as the previous contractor, a new permit for an exact mechanical change-out, or a new subcontractor permit when the Master Permit already has an approved CPMP.
Does the affidavit have to be notarized?
Yes. Each signature block has a notary section stating the signer was sworn and subscribed before a Florida notary public. The notary records whether the signer is personally known or showed identification, plus the date and notary name.
Who signs the CPMP affidavit?
The form has blocks for the property owner, the general contractor and the subcontractor. The subcontractor block is marked as not applicable for a change of contractor or a mechanical exact change-out.
What do I enter for the CPMP number on a mechanical change-out?
Write N/A in certification 1. The form marks the CPMP reference as not applicable for a mechanical exact change-out permit; in that section you enter only the Permit #.
Can I fill out the CPMP affidavit online?
You can fill out the PDF online on FillingPDF and download or print it. FillingPDF is independent of the City of Miami Beach and does not file the form; you still need the notary and must submit it with your permit application.
Ready to fill out Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL?
Fill out Affidavit in Lieu of the Construction Parking Management Plan (CPMP) – Miami Beach, FL now