The Contractors' Material & Test Certificate for Underground Piping is a Marietta, GA Fire Marshal's Office form that records NFPA 24 flushing and hydrostatic tests. Fill it out online on FillingPDF and download or print the completed PDF.
2 pages
Page 1 of 2
Page 2 of 2
Click a highlighted field to fill it in. Your data is deleted after 7 days.

The Contractors' Material & Test Certificate for Underground Piping is the certificate that the installing contractor and the property owner's representative complete and sign when underground fire protection piping is finished and tested. The printed form carries the heading of the Marietta Fire Department, Fire Marshal's Office, in Marietta, Georgia. It records the plans, pipe and joint types, flushing tests, hydrostatic tests, hydrants and control valves. On this page you can fill out the form online on FillingPDF and download or print the completed PDF; the city publishes the original at the address linked below.

Last updated

What is Contractors' Material & Test Certificate for Underground Piping – Marietta, GA?

The Contractors' Material & Test Certificate for Underground Piping is the Marietta Fire Department, Fire Marshal's Office form on which a contractor certifies the materials used and the test results for new underground fire protection piping, with the owner's representative witnessing and signing.

The form opens with a short procedure. When the work is complete, the contractor's representative makes the inspection and tests, and an owner's representative witnesses them. All defects must be corrected and the system left in service before the contractor's personnel finally leave the job. The certificate is then filled out and signed by both representatives, and copies are prepared for approving authorities, owners and the contractor.

The certificate is organized in blocks:

  • Property name, date, property address and the approving authority (the form names the Marietta Fire Marshal's Office).
  • Plans: whether the installation conforms to accepted plans and the equipment is approved, with deviations stated.
  • Instructions: whether the person in charge of fire equipment was instructed on control valves and care and maintenance, and whether charts were left on the premises.
  • Pipes and joints: pipe types and class, type of joint, and conformity of pipe, fittings and joint anchorage to the NFPA 24 standard.
  • Test description, flushing tests and hydrostatic tests.
  • Hydrants, control valves, date left in service, remarks, the installing contractor, who witnessed the tests, and signatures.

The form states that the owner's representative's signature does not prejudice any claim against the contractor for faulty material, poor workmanship, or failure to comply with the approving authority's requirements or local ordinances. It is a test and material record, not a permit or a business license.

Who needs to file Contractors' Material & Test Certificate for Underground Piping – Marietta, GA?

The installing contractor completes this certificate when it finishes underground piping for a fire protection system, together with an owner's representative. The form says the inspection and tests are made by the contractor's representative and witnessed by an owner's representative, and that the certificate is signed by both.

  • Contractor's representative: makes the inspection and tests, fills in the test results and signs on the line for the installing contractor, with a title and date.
  • Owner's representative: witnesses the tests and signs on the line for the property owner, with a title and date.
  • Approving authorities, owners and the contractor: each receives a copy; the form names the Marietta Fire Marshal's Office as the approving authority.

The form is specific to underground piping and refers to the NFPA 24 standard. It is not an application for a permit or a business license, and it sets no rule about who may sign for someone else; the signature lines are for the two representatives, each with a title.

When to file Contractors' Material & Test Certificate for Underground Piping – Marietta, GA

Complete the certificate upon completion of the underground piping work, once the inspection and tests have been made and witnessed. The form requires all defects to be corrected and the system left in service before the contractor's personnel finally leave the job, so the tests and the certificate come at the end of the installation, not before it.

The form prints no separate due date. The date left in service is one of the entries on the certificate, and the certificate carries its own date at the top. For timing of any Fire Marshal's Office inspection that goes with the project, contact the office at 770-794-5450.

How to fill out Contractors' Material & Test Certificate for Underground Piping – Marietta, GA

  1. Enter property name, date and address

    Fill in PROPERTY NAME, DATE and PROPERTY ADDRESS at the top of the certificate.

  2. Name the approving authority

    Under ACCEPTED BY APPROVING AUTHORITY(‘S) NAMES, the form lists the Marietta Fire Marshal's Office. Add its address in the ADDRESS space if the form asks.

  3. Answer the plans questions

    Mark YES or NO for whether the installation conforms to accepted plans and whether the equipment used is approved. If NO, describe the deviations on the line provided.

  4. Answer the instructions questions

    Mark YES or NO for whether the person in charge of fire equipment was instructed on control valve locations and care and maintenance, and whether copies of instructions and charts were left on the premises. Explain every NO.

  5. Describe pipes and joints

    Enter what the piping supplies (SUPPLIES BLDGS.), its location, pipe types and class, and type of joint. Mark YES or NO for pipe and fittings conforming to NFPA 24 and for joints needing anchorage being clamped, strapped or blocked as that standard requires, and explain any NO.

  6. Record the flushing tests

    For new underground piping and for lead-ins, mark YES or NO for flushing according to the standard, enter the company that flushed, and mark how the flow was obtained and through what type of opening. Explain any NO.

  7. Record the hydrostatic tests

    Enter the PSI and hours at which all new underground piping was tested, the total leakage measured in gallons over hours, and the allowable leakage in gallons over hours, figured with the equation printed on the form.

  8. Complete hydrants and control valves

    Enter the number of hydrants installed, type and make, and whether all operate satisfactorily. Mark whether water control valves were left wide open and state the reason if not, and whether hose threads are interchangeable with those of the answering fire department.

  9. Add date left in service and remarks

    Enter the DATE LEFT IN SERVICE, any REMARKS, the NAME OF INSTALLING CONTRACTOR and who witnessed the tests.

  10. Add signatures and additional notes

    The owner's representative signs on the line FOR PROPERTY OWNER and the contractor's representative on FOR INSTALLING CONTRACTOR, each with title and date. Use ADDITIONAL EXPLANATIONS AND NOTES for anything that did not fit.

  11. Review and download the completed PDF

    Check that every YES/NO answer is marked and every NO is explained. Download or print the completed PDF from FillingPDF, and prepare copies for the approving authority, owner and contractor as described under How to submit.

How to submit Contractors' Material & Test Certificate for Underground Piping – Marietta, GA

The form itself prints no portal, mailing address or delivery rule. It says only that copies shall be prepared for approving authorities, owners and the contractor. The approving authority named on the form is the Marietta Fire Marshal's Office.

  • Fire Marshal's Office: 112 Haynes Street, 2nd Floor, Marietta, GA 30060 (the form heading prints 112 Haynes Street NE). The City of Marietta's inspections page lists the office phone as 770-794-5450.
  • Copies: prepare a signed copy for the approving authority, one for the owner and one for the contractor.

Before you deliver the certificate, confirm with the Fire Marshal's Office how it wants to receive it for your project, since the form does not say. Both representatives must have signed, with titles and dates. FillingPDF lets you fill out and download the PDF; submission follows the channels the Fire Marshal's Office gives you.

Common mistakes to avoid

  • Leaving the system out of service, or defects uncorrected, when the contractor's personnel leave the job; the form requires defects corrected and the system left in service first.
  • Submitting the certificate signed by only one representative; the form requires the contractor's and the owner's representatives to sign.
  • Answering No to conformity to plans or approved equipment without stating the deviations on the "IF NO, STATE DEVIATIONS" line.
  • Marking No on a pipe, fitting, joint anchorage or flushing question and leaving the "IF NO, EXPLAIN" line blank.
  • Entering hydrostatic test pressure or duration that does not match the printed requirement: 200 psi or 50 psi over working pressure, whichever is greater, held ±5 psi for 2 hours.
  • Reporting leakage above the allowable amount without checking it against the printed equation L=(SD√P)/148,000.
  • Skipping the flushing blocks for lead-ins or leaving the flow source (public main, tank, fire pump) unmarked.
  • Not preparing copies for the approving authority, the owner and the contractor.

Frequently asked questions

What is the Contractors' Material & Test Certificate for Underground Piping?

It is a Marietta Fire Department, Fire Marshal's Office certificate on which the installing contractor records the materials, flushing tests and hydrostatic tests for new underground fire piping. The owner's representative witnesses the tests, and both representatives sign.

Is this form a Marietta business license application?

No. It is a test and material certificate for underground piping and does not apply for a Marietta business license. The City's Fire Marshal's inspections page lists Business License Approval/Tenant Move-in among the inspections the office handles, but the form itself does not mention it.

Who has to sign the underground piping certificate?

Two people sign: a representative of the property owner and a representative of the installing contractor, each with a title and date. The form says the owner's representative's signature does not prejudice any claim against the contractor for faulty material or poor workmanship.

When do I complete the underground piping test certificate?

Complete it when the work is finished and the inspection and tests have been made and witnessed. The form requires all defects to be corrected and the system left in service before the contractor's personnel finally leave the job.

What hydrostatic test pressure does the form require?

The form states that piping is tested at 200 psi or 50 psi above the system working pressure, whichever is greater, and must hold that pressure ±5 psi for 2 hours. Makeup water must not exceed the limit from the printed equation L=(SD√P)/148,000.

Where do I send the completed certificate?

The form prints no delivery channel. It names the Marietta Fire Marshal's Office as approving authority, located at 112 Haynes Street, 2nd Floor, Marietta, GA 30060; call 770-794-5450 to confirm how the office wants to receive it for your project.

Can I fill out this certificate online on FillingPDF?

Yes. You can fill out the PDF online on FillingPDF and download or print it. FillingPDF is an independent service, is not connected to the City of Marietta and does not submit the certificate; delivery follows the Fire Marshal's Office instructions.

Ready to fill out Contractors' Material & Test Certificate for Underground Piping – Marietta, GA?

Fill out Contractors' Material & Test Certificate for Underground Piping – Marietta, GA now