The Irrigation System Certificate of Completion Form is the City of Dallas document on which a Licensed Irrigator confirms that the required items were completed and provided to the property owner. It is tied to a project's permit number, so it is one of the forms handled alongside a Dallas permit, and it must be presented to the Irrigation Inspector before the final inspection is issued. On this page you can fill out the form online on FillingPDF and download or print the completed PDF; the form itself is published by the City of Dallas at the official link.
Last updated
What is Irrigation System Certificate of Completion Form – Dallas, TX?
The Irrigation System Certificate of Completion Form is a City of Dallas form on which a Licensed Irrigator certifies that the closing requirements for an irrigation system were completed and provided to the property owner, and that the work complies with the rules the form lists.
The form is printed with the Planning & Development Department, 320 E Jefferson Blvd, Dallas TX 75203, and the phone number (214) 948-4480. It identifies the project by Project Address and Permit#, then lists six numbered requirements to check off:
- a written warranty;
- maintenance, alterations or repairs and a list of materials used, and any warranty, if provided;
- a final walk-through with the owner or the owner's representative to explain how the system operates;
- for new installations, a maintenance checklist (controller manual, seasonal watering schedule, components needing service, and a required statement);
- a permanent waterproof sticker on the automatic controller with the irrigator's details;
- the irrigation plan showing the actual installation.
By signing, dating and affixing the TCEQ-issued irrigator's seal, the irrigator certifies full compliance with Title 30 of the Texas Administrative Code, Chapter 344, Landscape Irrigation, with Chapter 54, Dallas Plumbing Code, Appendix F, and with Chapter 57, Dallas One- and Two-Family Dwelling Code. The certificate is kept as part of the inspection records for the project.
Who needs to file Irrigation System Certificate of Completion Form – Dallas, TX?
The Licensed Irrigator responsible for the installation completes and signs this certificate. The form says the irrigator must sign, date and seal it with the irrigator seal issued by the Texas Commission on Environmental Quality (TCEQ), in accordance with Title 30, Texas Administrative Code, Chapter 344, Section 344.43.
The property owner or the owner's representative is the person who receives the items listed: the warranty, the maintenance information, the walk-through, the checklist for new installations and the irrigation plan. The form does not ask the owner to sign.
Item 4, the maintenance checklist with its four parts (A) to (D), applies to new installations only. The form names no one else who may sign for the irrigator, and it says staff cannot accept incomplete or illegible documents. For questions about whether your project needs the certificate, the form lists the Planning & Development Department at (214) 948-4480.
When to file Irrigation System Certificate of Completion Form – Dallas, TX
The certificate must be presented to the Irrigation Inspector before the final inspection is issued. Complete it once the work is finished and the listed items have been completed or provided to the property owner, so it is ready when the final inspection is requested. The form sets no other deadline and prints no processing time. The certificate is kept as part of the inspection records for the project, and the form is dated 3/28/2025.
How to fill out Irrigation System Certificate of Completion Form – Dallas, TX
Enter project address and permit number
At the top, write the Project Address of the irrigation installation and the Permit# for the project.
Check the written warranty
Check item 1 once a written warranty has been provided to the property owner (Section 344.72).
Check maintenance and materials records
Check item 2 when maintenance, alterations or repairs and a list of materials used, and any warranty, if provided, have been given to the owner (Section 344.72 (c)).
Confirm the final walk-through
Check item 3 after the final walk-through with the owner or the owner's representative, in which you explained how the system operates (Section 344.63 (1)).
Complete the new-installation checklist
For new installations only, check item 4 and each sub-item that applies: (A) controller manual, (B) seasonal watering schedule, (C) list of components needing service and frequency, (D) the printed statement about installation and testing.
Confirm the controller sticker
Check item 5 and each line once a permanent waterproof sticker is attached to the automatic controller: irrigator's name, license number, company name, telephone number and warranty period dates.
Check the irrigation plan
Check item 6 when the irrigation plan showing the actual installation of the system has been provided to the irrigation system owner.
Read the certification statement
Read the paragraph certifying compliance with Title 30 TAC Chapter 344, Chapter 54 Dallas Plumbing Code Appendix F and Chapter 57 Dallas One- and Two-Family Dwelling Code before signing.
Sign, date and seal the certificate
The Licensed Irrigator signs on the Signature line, enters the Date and affixes the TCEQ irrigator's seal in the space provided.
Review and download the completed PDF
Check that every line is legible and complete, then download or print the completed PDF from FillingPDF and present it to the Irrigation Inspector as described under How to submit.
How to submit Irrigation System Certificate of Completion Form – Dallas, TX
Present the signed and sealed certificate to the Irrigation Inspector before the final inspection is issued; the form names no other channel.
- To the Irrigation Inspector: the form is printed with the Planning & Development Department, 320 E Jefferson Blvd, Dallas TX 75203, and the phone number (214) 948-4480. Call that number to confirm how to reach the inspector for your project.
- What to include: the Project Address and Permit#, the irrigator's signature and date, and the TCEQ irrigator's seal.
The form warns that staff cannot accept incomplete or illegible documents, so make sure every box and the seal are clear before you present it. FillingPDF lets you fill out and download the PDF; submission follows the channels above.
Common mistakes to avoid
- Presenting the certificate unsigned, undated or without the TCEQ-issued irrigator's seal; the Licensed Irrigator must sign, date and seal it.
- Submitting an incomplete or illegible form; the form states that staff cannot accept incomplete or illegible documents.
- Leaving the Project Address or Permit# blank, so the certificate cannot be matched to the project's inspection records.
- Skipping the item 4 maintenance checklist on a new installation; items (A) to (D) apply to new installations.
- Checking item 5 without attaching a permanent waterproof sticker to the automatic controller showing the irrigator's name, license number, company name, telephone number and warranty period dates.
- Checking items before they are done, such as the final walk-through with the owner or the owner's representative.
- Waiting until after the final inspection to present the certificate; it is required before the final inspection is issued.
- Omitting the irrigation plan showing the actual installation of the system from what is given to the owner (item 6).
Frequently asked questions
What is the Irrigation System Certificate of Completion?
It is a City of Dallas form in which a Licensed Irrigator certifies that required items, such as the warranty, walk-through, maintenance information and irrigation plan, were completed and given to the owner. It is kept in the project's inspection records.
Who has to sign the Dallas irrigation certificate of completion?
The Licensed Irrigator. The form says the irrigator must sign, date and seal it with the irrigator seal issued by the Texas Commission on Environmental Quality (TCEQ), under Title 30 TAC Chapter 344, Section 344.43.
When do I need to present the certificate?
Before the final inspection. The form states the certificate must be presented to the Irrigation Inspector prior to the issuance of a final inspection, and it is then kept as part of the inspection records for the project.
Is this form a Dallas permit?
No. It is a completion certificate presented to the Irrigation Inspector, not a permit application. It asks for the Permit# of the project, so you need that number from your Dallas permit before filling it out.
Does item 4 apply to every irrigation system?
No. Item 4, the maintenance checklist with parts (A) to (D), is for new installations only. Items 1, 2, 3, 5 and 6 are listed without that limit.
What goes on the sticker required by item 5?
A permanent waterproof sticker on the automatic controller showing the irrigator's name, license number, company name, telephone number and the warranty period dates. The form lists each of these as a line to check.
Why was my certificate not accepted?
The form states that staff cannot accept incomplete or illegible documents. Check that the project address, permit number, checked items, signature, date and TCEQ seal are all present and readable.
Can I fill out the irrigation certificate online on FillingPDF?
Yes. You can fill out the PDF online on FillingPDF and download or print it. FillingPDF is independent of the City of Dallas and does not submit the form; you present it to the Irrigation Inspector yourself.
Ready to fill out Irrigation System Certificate of Completion Form – Dallas, TX?
Fill out Irrigation System Certificate of Completion Form – Dallas, TX now
