The Request for Temporary Utilities Electric and/or Gas is the City of Dallas Development Services Department form a contractor completes to ask for temporary electric power, gas, or both on a project that already has a Dallas permit number. The PDF pairs a page of contractor requirements, titled Electric and Gas Temporary Utility Release Form, with the request itself, which is sworn before a notary. On this page you can fill out the form online on FillingPDF and download or print the completed PDF; the original is published by the City of Dallas at the link below.
Last updated
What is Request for Temporary Utilities Electric and/or Gas – Dallas, TX?
The Request for Temporary Utilities Electric and/or Gas is the City of Dallas Development Services Department form on which a contractor asks to have electric power, gas, or both released temporarily to a building project before final inspections are complete.
The PDF has two pages. Page 1 is headed "Electric and Gas Temporary Utility Release Form" and sets out what each trade must have done before release. It refers to the most current Chapters 53 (Building), 54 (Plumbing), 55 (Mechanical), 56 (Electrical), 57 (One & Two Family) and 60 (Fuel Gas) of the Dallas Construction Codes, and ends with an acknowledgement signature and date. Page 2 is the request itself. It records the project address, suite, building or floor, the permit number, the applicant and company, which utility is to be released, whether an application has been made with the utility company, and the purpose of the release.
By signing, the applicant states that life safety items must comply with the building, plumbing, mechanical and electrical codes or the release will not be approved. The applicant also agrees that the premises will not be occupied before all final inspections are approved and a Certificate of Occupancy is obtained, if required, and that the utility will be disconnected within a stated number of days from the release date or on failure to comply. The applicant's signature is sworn before a notary. The Department completes the "Approved by" and "Date approved" lines, and the release is subject to the field inspector's approval.
The form is a request for a temporary release. It is not the permit itself, and it does not replace final inspections or a Certificate of Occupancy.
Who needs to file Request for Temporary Utilities Electric and/or Gas – Dallas, TX?
Contractors working under a Dallas permit who need electric power or gas released temporarily before the project is complete use this form. The page 1 checklist sets conditions for three groups:
- Building contractor: completes and signs the form, and must have framing approval (building), top-out (plumbing), duct (mechanical) and electrical inspections before gas release. The building must be secure, the address posted and visible from the street, and a temporary utility inspection requested.
- Electrical contractor: completes and signs the form, must have a valid reason for release of power, an electrical room that is "dried in," a panel with a lock or a lockable door to the electrical room, and a passed service inspection.
- Plumbing/mechanical contractor: completes the form and returns it to the designated Building Inspection District Office, once the fuel gas system and appliance requirements listed on page 1 are met.
Page 2 labels the signer "Electric, General or Plumbing Contractor." If both gas and electric temporary services are requested, notification and inspections must be arranged with both the Plumbing and Electrical Inspectors. The general contractor or owner is responsible for re-inspection fees if the work is not ready.
When to file Request for Temporary Utilities Electric and/or Gas – Dallas, TX
Submit the request when a project needs temporary electric or gas service before it is finished, and only after the page 1 conditions for your trade are met. For gas, the building contractor needs framing approval (building), top-out (plumbing), duct (mechanical) and electrical inspections first, and the entire fuel gas system must be complete, tested and inspected at the time of the request or before. For electric, the service inspection must be passed and the equipment covered by the release must have wiring that is 100% complete.
The form sets no calendar deadline. It does set a limit after release: the applicant agrees that the utility will be disconnected within a number of days written on the form, counted from the temporary utility release date, or sooner on failure to comply with the stated requirements. The premises must not be occupied before all final inspections are approved and a Certificate of Occupancy is obtained, if required.
Documents you need
- A notarized letter from the general contractor and the electrical contractor stating that only the journeyman overseeing the job will have the key; required of the electrical contractor under the page 1 checklist.
How to fill out Request for Temporary Utilities Electric and/or Gas – Dallas, TX
Review your trade's requirements
Read page 1 and confirm the conditions for the building, electrical or plumbing/mechanical contractor are met before you request release.
Sign the acknowledgement
On page 1, add your signature and the date in the Acknowledgement block.
Enter the project location
On page 2, fill in ADDRESS OF PROJECT, SUITE/BLDG./FLOOR and the PERMIT NUMBER.
Enter applicant and company details
Complete APPLICANT, POSITION, TITLE and COMPANY NAME, then address, city, state, ZIP code, phone and email.
Select the utility to release
Under UTILITY TO BE RELEASED, check ELECTRIC, GAS, or both. Check YES or NO for whether you have made an application with the utility company.
State the purpose of the release
Complete the sentence "I am requesting this utility to be released for the purpose of:" with the reason for the temporary release.
Fill in the disconnection period
In the third agreement statement, enter the number of days after the temporary utility release date within which the utility will be disconnected.
Complete the contractor block
Enter the DATE REQUESTED, print the applicant's name under APPLICANT, and leave the signature for the notary visit, because this section is marked "fill out at notary."
Leave the notary and approval lines
The notary completes the sworn-statement lines, county, state and commission expiration. The Department completes APPROVED BY and DATE APPROVED.
Review and download the PDF
Check the permit number, utility boxes and dates, then download or print the completed PDF from FillingPDF and take it to the notary and the inspection office as described under How to submit.
How to submit Request for Temporary Utilities Electric and/or Gas – Dallas, TX
The form names these routes: the designated Building Inspection District Office for the completed form, and an inspection request for the trade involved.
- Plumbing/mechanical contractors: return the completed form to the designated Building Inspection District Office. The inspector scans it and places it in the documents folder of the permit in POSSE. The plumbing contractor makes the inspection request as a 231 inspection type, with the note "Temporary Utilities Release."
- Electrical contractors: the electrical contractor is responsible for calling the 310 inspection code. No equipment or lighting may be energized before inspector approval.
- Gas and electric together: arrange notification and inspections with both the Plumbing and Electrical Inspectors.
Page 2 has a section marked "fill out at notary": the applicant signs before a notary public. Questions go to the Development Services Department, 320 E Jefferson Blvd, Dallas TX 75203, (214) 948-4480. The form lists no online filing channel. FillingPDF lets you fill out and download the PDF; submission follows the channels above.
Common mistakes to avoid
- Requesting gas release before framing approval (building), top-out (plumbing), duct (mechanical) and electrical inspections are done.
- Requesting gas release before the entire fuel gas system is complete, tested and inspected.
- Signing the applicant line on page 2 before reaching the notary, when that section is marked "fill out at notary."
- Asking for electric release without a lockable panel or electrical room door, or without the notarized key letter from the general and electrical contractors.
- Energizing equipment or lighting before the inspector approves.
- Making the plumbing inspection request without the 231 inspection type or the note "Temporary Utilities Release."
- Arranging only one inspection when both gas and electric temporary services are requested; both the Plumbing and Electrical Inspectors must be notified.
- Occupying the building before all final inspections are approved and a Certificate of Occupancy is obtained, if required.
- Calling for inspection before the work is ready; the general contractor or owner pays re-inspection fees.
Frequently asked questions
What is the Dallas temporary utility release form?
It is the City of Dallas Development Services Department's Request for Temporary Utilities Electric and/or Gas. A contractor uses it to ask for electric power, gas, or both to be released temporarily to a project before final inspections are complete. Release is subject to the field inspector's approval.
Is this form a Dallas permit?
No. It is a request for temporary utilities, not a Dallas permit. The form asks for the project's permit number, and the plumbing inspector places the completed form in the documents folder of that permit in POSSE.
Does the temporary utilities request have to be notarized?
Yes, the applicant's part of page 2 is sworn before a notary public. The contractor block is marked "fill out at notary," so sign it in the notary's presence. Electrical contractors also need a notarized letter about who holds the key.
What do I need before gas can be released?
The building contractor needs framing approval (building), top-out (plumbing), duct (mechanical) and electrical inspections. The plumbing/mechanical checklist adds installed exterior doors and windows, appliance venting, capped gas stops, combustion air, access, a thermostat, and a complete, tested and inspected fuel gas system.
How do I request the inspection for temporary utilities?
The plumbing contractor requests a 231 inspection type with the note "Temporary Utilities Release." The electrical contractor is responsible for calling the 310 inspection code. If both gas and electric are requested, arrange both the Plumbing and Electrical inspections.
Can I occupy the building once temporary utilities are released?
No. By signing, the applicant agrees that the building, suite or premises will not be occupied before all final inspections are complete and approved and a Certificate of Occupancy is obtained, if required.
What happens if the work is not ready at inspection?
The general contractor or owner is responsible for re-inspection fees if the work is not ready, according to the building contractor checklist. Contact the Development Services Department at (214) 948-4480 for the current fee amount.
Can I fill out the temporary utilities request online on FillingPDF?
You can fill out the PDF online on FillingPDF and download or print it. FillingPDF is an independent service: it does not file the request, arrange notarization or schedule inspections with the City of Dallas.
Ready to fill out Request for Temporary Utilities Electric and/or Gas – Dallas, TX?
Fill out Request for Temporary Utilities Electric and/or Gas – Dallas, TX now